Could you show the evidence
behind a go-live decision?
Fifteen questions across the five things that decide whether an SAP go-live is defensible. You get a score and a position on each of the five straight away — no sign-up, nothing to install, and nothing sent to us unless you ask for the written report at the end.
The five things a go/no-go decision rests on.
These are the same five we report on in a Go-Live Assurance engagement. Three questions each, and the check scores them separately — because a programme is rarely weak everywhere, and knowing which one is thin is the useful part.
Scope and coverage
Does the test scope reflect what the business actually runs?
Test scope is usually written from requirements and design documents, which describe what the system was asked to do rather than what the business does with it every day. The gap between the two is where go-live surprises live — a variant nobody listed, a process a single plant runs differently, a step that only matters at month end.
Test data readiness
Does your test data represent what production will throw at it?
A test that passes on clean data proves the code runs, not that the business will. Volumes, month-end conditions, blocked stock, partial deliveries, returns, tax and pricing exceptions — these are where SAP behaves differently, and they are the conditions test data is least likely to contain.
Regression cycle time
How long does one complete cycle take, and can you afford another?
Regression cycle time is the single number that decides how much room a programme has left. It governs how many full passes you can complete before the date, whether a late change can be absorbed, and whether the last cycle finishes with time to fix anything it finds.
Automation effectiveness
What is your automation protecting, and is anyone maintaining it?
Automation earns its place when it protects the scenarios that repeat every release and someone keeps it working as SAP changes. Unmaintained automation is worse than none: it reports green against a suite that no longer reflects the system, and the programme trusts it.
Defects and business risk
Can you say which business processes are at risk today?
A defect list ordered by severity tells leadership how many problems there are. It does not tell them which parts of the business will not work on Monday. The translation from defect to business consequence is the one a go/no-go decision actually needs, and it is usually made in the room, verbally, on the day.
A check, not an assessment.
This is fifteen questions and an honest arithmetic. It cannot look at your test pack, your defect data or your automation, and it does not pretend to — a real Go-Live Assurance engagement measures those directly and gives leadership a position per business capability with the evidence behind it.
What this will do is tell you which of the five you cannot currently evidence, which is usually the thing worth knowing first. Every answer stays in your browser until you ask for the report.
If you would rather just talk it through, write to us — there is no charge for a conversation, and if we are not the right fit we will tell you.
